Step 1
We removed the grass and placed it on plastic so we could replace it when we were finished.
Step 2
Our crew removed the dirt needed to give the discharge line pitch and allow for the water to properly flow away from the home.
IceGuard
Here you can see the ice guard product for our triple safe Sump unit. The IceGuard product ensures the pipes won't freeze during the winter and the water will continue to flow out of your home.
Ready for backfill
Our crew laid the pipe in the ditch. As they laid the pipe into the ditch they checked the pitch to make sure it was perfect. They also place gravel around the end of the discharge line which in this case was a bubbler pot.
Finished product
After our crew backfilled the ditch it is hard to tell we were even there!