Before
Here you can see the retaining wall is flush with the foundation wall.
Step 1
First we dig holes behind the wall where we are going to anchor the support plates. Second, we drill holes through the wall.
Step 2
After we have the hole in the wall we ram the rods through the wall and into the holes we dug.
GeoLock Anchor
Here you can see one of our GeoLock anchors in place
Before
Here you can see the wall moved over 3 inches prior to our arrival. With the GeoLock anchor system we will pull the wall back to the way it was before erosion moved the wall.
GeoLock Anchor
This is a picture of the GeoLock anchor attached to the wall.
Tightening the wall
We tighten the anchors to the wall and use this system to suck the wall back to where it was before.
After
Here you can see the caps we put on the wall to hide the GeoLock anchors so they blend into the wall better.
After
This image shows another view of the wall after it has been moved back to where it orignially was installed
After
Here you can see how far we were able to move the wall back to almost the exact place the wall started!