
Before 1
You can see this crawlspace was not in good condition when we arrived

Before 2
Here you can see the floor joists are rotting and the insulation is moldy and falling out

Before 3
This is another picture of the crawlspace before we started working.

During 1
This is a picture of one of our system specialists checking for rot in the floor joists and removing the fiberglass.

installation of floor joists
Here we sistered new Floor joists to the old ones

new floor joists
Here is another picture of the new floor joists.

During 8
Next we placed pre cast footings on the floor to disperse the weight of the new SmartJack foundation support system and I-beam.

During 9
Next we installed the smart jack and the I-beam.

During 10
after we get the I-beam on the SmartJack we extend the SmartJack to support the home.

After 1
Here is a picture of the new I-beam and SmartJack system with new floor joists.

After 2
Here is a picture of how clean the crawlspace was when we left, also you can see our SaniDry CX unit.